Saturday 27 February 2016

More the conversion of the yellow lifeboat

Starting to fit the toilet/shower room bulkheads to close off that area from the rest of the boat 


The battery box area before they are put into a proper battery management box and with its own inverter system to run the 240 volts systems off grid


Fitting the first of the bulkheads to the side of the boat, Once fitted then the fibreglass will be cleared of flowcoat back to bare fibreglass and the bulkhead will be glassed in position. 


The first parts of the fore and aft bulkheads starting to be fitted into position ready for the areas top and bottom to be cleared back ready to glass in these two part of the fore and aft bulkhead.


The original engine manual or at lease part of it