Thursday 20 August 2015

Get back on with a long term new build project

At long last I have been able to get the Mai-Star Class dinghy back beside the workshop and have got it back in position to make a start on the boat again.

Just had to get the bracing back into position to ensure the dinghy was all set to again so the last four planks can get fitted and the dinghy can then get its ribs fitted and the rest of the fit out can get underway.



No comments:

Post a Comment