Monday 14 April 2014

Busy day on Mai-Star II

A large gap between the stern post and the inner knee, most of this will go when the boat is back in the water and a couple of through bolts are put in the stern post and the two are bolted together.
 

 
The new two bilge pump outlets dry fitted.
 
The two outlets from the outside
 The port side all back to bare wood and the started to be sanded down ready to have work done on the hull.
 A head on photo before and after and showing the waterline being change as the weight in the boat is now changed.
 The hull now started to be sanded back ready to have the work done on the hull.

No comments:

Post a Comment